On 30 September, a crane placed the new tram bridge structure over the Navile canal in Corticella: 192 tonnes with a single 46-metre span. Parts of the bridge deck still need completing. [1]

The crossing is intended to connect Shakespeare stop with the Green Line terminus at Corticella railway station. Lifting the bridge into place does not mean the tram has opened to passengers. [2][1]