Nuclear Restoration Services announced on 9 November that physical remediation of 4.2 hectares at Harwell in Oxfordshire was complete. More than 97,000 tonnes of material, including buried structures, were removed from the former effluent treatment plant and neighbouring sewage area. Public access has also been restored to the section of Icknield Way alongside the site. [1]

A new surface-water drainage pond also provides wildlife habitat. Material excavated to create it was reused to reshape the area: NRS estimates that this avoided importing around 60,000 tonnes of material and prevented approximately 2,700 vehicle movements. These are the agency’s estimates. Future reuse of the land remains a possibility: final procedures to remove its nuclear licence and surrender the environmental permit are still under way. [1]